|
Infrastructure
As a top consulting engineering firm, Henry Adams is constantly called upon to solve infrastructure
deficiencies. Some of those deficiencies are inherent in the original design, and some are due to
expansions or renovations to the facility. We have designed new central plants, including those with
chillers, boilers, and electrical generation to serve campuses, convention centers, and
district utilites. We are dedicated to providing our client with the newest technology and highest
level of service to enable their infrastructure to succeed.
|
|
|
Related Projects:
- NAVFAC Indian head Treatment Plant
- UMB HSF#2 Distributed Generation
- GSA Byrne Courthouse Piping Replacements
- Arlington County: Lynne Street Esplande
- DC Department of Transportation : Garfield Canal Park
- The Johns Hopkins University; Applied Physics Laboratory: Building 20 District Utility Plant
- Department of Veterans Affairs: Vulnerability Assessment
- Morgan State University: Parking Structure - Ice Storage Facility
- West Virginia Wesleyan College: Christopher Hall of Science - Chiller and Boiler Replacement
- Baltimore City - M/E Open End: Westport Sewage Pumping Station
- Baltimore City - M/E Open End: Locust Point Sewage Pumping Station
- Union Memorial Hospital: Johnston Professional Building - Emergency Generator Installation
- Montgomery County: Kensington, Fenton and Kennett Streetscapes
- Morgan State University: Switchgear
- Alarm Watch Expansion: Data Center Emergency Electrical Distribution
- PGCC Water Main Replacement Project
- PST & EC
- JHU/APL Bldg 13 CMP
- JHU/APL Bldg 4, 7 & 9 Cooling Tower
- JHU/APL Bldg 1 Boiler Plant Serves Bldgs 1, 2, 5, 6, 13, 26 & Library
- APG Building 4407 District Medium Temperature Heating Water And Chilled Water Campus Distribution
- JHU/APL Mcs 20 Underground Electric Distribution
|
 |
|