VAMC Martinsburg, SPD Renovation

Henry Adams provided the MEP engineering design for the repairs to the mechanical and electrical systems in the SPD/SPS area including the SPS and SPD office areas in the basement of Building 500. The mechanical design included the removal and replacement of all utilities, as well as the installation of stainless steel piping and providing an exhaust system that is not dependent on SPD Expanded area. The electrical design included the replacement of all lighting with LED fixtures.

Additional Information:

LocationMartinsburg, WV
Construction Value $4,000,000
OwnerVeterans Affairs Medical Center
ArchitectOKKS Studios / Delta